Project Introduction:

Function: Industrial park peak shaving and valley filling

Project completion: November 2022

Configuration: 1.5MW/9MWH


Using container energy storage, the capacity of a single system is 1.8MWH, and the energy storage converter is 300kw.

The project consists of 5 containers with a total system configuration of 1.5MW/9MWH


Peculiarity:

1.Peak-to-valley price spread arbitrage, intelligent power backup

2.High energy density

3.Load tracking, flexible reverse power protection

4.Remote control & monitoring

5.Battery modular design, easy to install and maintain